U.S. Energy Information Administration logo
Skip to sub-navigation

Refinery Capacity Report

With Data for January 1, 2024 Release Date: June 14, 2024 Next Release Date: June 2025
Previous Issues

Data series include fuel, electricity, and steam purchased for consumption at refineries; refinery receipts of crude oil by method of transportation; and current and projected atmospheric crude oil distillation, and downstream charge capacities and production capacities of selected products. Respondents include all operating and idle petroleum refineries (including new refineries under construction) and non-refinery operators of distillation, reforming, cracking, coking, and hydrotreating processes, and refineries shut down during the previous year. These refineries are located in the 50 States, the District of Columbia, Puerto Rico, the U.S. Virgin Islands, Guam, and other U.S. possessions.

XLSX --- Refinery Capacity Data by individual refinery as of January 1, 2024
Source --- Energy Information Administration (EIA), Form EIA-820, "Annual Refinery Report".
Data Tables Full Report
1 Number and Capacity of Operable Petroleum Refineries by PAD District and State as of January 1, 2024 PDF
2 Production Capacity of Operable Petroleum Refineries by PAD District and State as of January 1, 2024 PDF
3 Capacity of Operable Petroleum Refineries by State and Individual Refinery as of January 1, 2024 PDF
4 Production Capacity of Operable Petroleum Refineries by State and Individual Refinery as of January 1, 2024 PDF
5 Refiners' Total Operable Atmospheric Crude Oil Distillation Capacity by Individual Refinery as of January 1, 2024 PDF
6 Operable Crude Oil and Downstream Charge Capacity of Petroleum Refineries PDF
7 Operable Production Capacity of Petroleum Refineries PDF
8 Capacity and Fresh Feed Input to Selected Downstream Units at U.S. Refineries, 2022 - 2024 PDF
9 Refinery Receipts of Crude Oil by Method of Transportation by PAD District, 2023 PDF
10a Fuels Consumed at Refineries by PAD District, 2023 PDF
10b Natural Gas Used as Feedstock for Hydrogen Production by PAD District, 2023 PDF
11 New, Shutdown and Reactivated Refineries During 2023 PDF
12 Refinery Sales from January 2, 2023 to January 1, 2024 PDF
13 Refineries Permanently Shutdown by PAD District Between January 1, 1990 and January 1, 2024 PDF
Explanatory Notes PDF

Related Links:

Note:  The EIA-820 refinery capacity survey was not conducted for January 1, 1996 or January 1, 1998.

The Refinery Capacity Report became a separate product in 2006, which includes tables in PDF format and an individual refinery XLS file.

Individual refinery XLS files from 1994 - 2005 are available from the drop down menu above.

Previous versions of refinery capacity tables from 1997 - 2005 are available on the Petroleum Supply Annual, Volume 1 Historical page.